Risk management strategy for uncertain systems: Decommissioning of Fukushima Daiichi nuclear power station

CSD&M 2017

Risk management strategy for uncertain systems: Decommissioning of Fukushima Daiichi nuclear power station

Speaker:
Akira Yamaguchi – The University of Tokyo

Abstract:
Risk management strategy for uncertain systems is proposed and applied to Fukushima Daiichi decommissioning project. It is an uncertain work on which public have significant concern. There exist several risk sources which importance is different in terms of hazard potential and confinement performance. A priority of each risk source is evaluated. Retrieval of fuel assemblies from a spent fuel pool is highly prioritized. Four principles and three risk metrics are defined in the risk assessment. A success path is developed and possible threats are identified for technical/societal/management aspects. As knowledge is limited on the current situations, the decommissioning is performed with wide-scope and long-term perspective. The risk assessment and management process needs to be updated as the most recent information and knowledge on the systems become available.

To scroll through the slides use the toolbar at the bottom of the presentation.

[pdf-embedder url=”https://cesam.community/wp-content/uploads/2022/06/CSDM2017-Akira-Yamaguchi-diffusable.pdf” title=”CSDM2017 Akira-Yamaguchi-diffusable”]

LATEST ARTICLES

Autonomous vehicles: a game changer for urban mobility
The RATP Group, also known as the Régie Autonome des Transports Parisiens (English: Autonomous Operator...
Continue reading
Autonomous driving : a major disruption for automotive industry
Dipl.-Engineer, Remi Bastien is Vice President for Automotive Prospective at Renault Groupe, reporting to the...
Continue reading
Smart Energy: the world’s largest and most complex machine
Richard Schomberg is currently IEC Ambassador for Smart Energy, Chairman of IEC Smart Energy System...
Continue reading